Wednesday, November 05, 2008
SCRUM practitioners in Sri Lanka ?
Not Only SCRUM I see lots of professionals get enrolled with PMI too.. The Only problem with PMP certification is that one needs to have minimum of 5 years Experience by managing farley good projects to face the exam well and lengthy study cycles. But for Scrum Master training its just 2 days course most the time.
Ok., for a newbie who is confused on for what to spend time and money its like this…
PMP certification is offered by PMI institute USA and it’s the largest Project Management institute in the world at the moment.
PMP exam covers almost all the aspects of Project Management, Starting from Ethics, soft skills PM technical skills etc …. And the framework is industry independent.
But SCRUM training covers only How you practice SCRUM. The basic guidelines. So you cannot expect to be a certified Project Manager by learning only SCRUM.. I think both these certifications together comes very handy for any good Project Manager in Software Industry.. Its matter of how you find time for all these :) Anyway I wish if we have enough SCRUM professionals in SL to build a SCRUM community.. Most the countries has that. Yes We have a PMI Colombo chapter already..
Tuesday, November 04, 2008
SCRUM ... Issues.. ?
Labels: Estimation of Product Backlog, Scrum, Scrum Challenges, Scrum Issues
Will SCRUM kill the creativity of the development teams… ?
Developers produce piece of code.. in SCRUM we go up to the atomic level planning..so this specific task can be done in X number of hours.. true.. But if there is no such time boxes can they be much more creative…….I mean if we don’t look at the daily velocity of the graph… what would it be?
Hmmmmm… Hmmmm….. Hm…. I was stuck…. Yeah there is a point..
While going home I was thinking about this...
I think its like this .. In SCRUM we discuss what the customer wants in detail and in more detail at the Product backlog meeting as well as in Sprint planning meetings.. So we understand what our customers expectations are to a greater extend. So what we all do is producing what customer wants.
No matter what the methodology or framework we use, we design the architecture and we develop the code..With long planned frameworks what I see is that the developers have more time for creativity.. true.. But it enables more risk of over engineering.. Which result much more risk of sacrificing quality or delivery times at the latter stage of the project which results the project failures. May be soem most important part of the project ... who knows...Especially those long planed methodologies commit on specific strict deadlines.
In this case I think by using SCRUM one can eliminate those over engineering and risk of schedule overruns at the latter stage..In the same time it enables the “Defined creativity” :-)
if somebody needs to be much creative about a features or a piece of code, they can even discuss this at the daily scrum meeting.. making it transparent.. adjusting the calories of the sprint backlog. “Yeah I hear you techies.. That’s not the tech thingies work right ...LOL...!!! But unfortunately that’s the way the “bottom line” works :-) there are tradeoffs …
Now that I wrote about this, I need to explain few problems I see in SCRUM.. I see some of the practitioners believe scrum like a religion.. But thats not right.,.. As I say in my own words. SCRUM is not god given.. Its still evolving as a framework and still we see many issues.. Following are some of the issues I saw when practicing scrum.
Agile doesn’t fit for everybody . we have few left alone people when we introduce Agile Practice to corporate
The customer needs to be well educated.. Yeah .. they say “Think Agile” but never works that way.. need proper discussions and the understanding with the product owner before providing that much of transparency. Otherwise this will make your project and life miserable.
In the same time it’s a stress to commit to 8 hour work tasks everyday.. I know few guys who plan their sprints with 6, 7 hour tasks. May be that’s a solution.. but teams need to mature a bit to work with that.
Sometimes introducing gaps between sprints also helps and teams needs to be cared more when practicing scrum.
Sunday, October 19, 2008
Dealing with difficult people...

Im not so bad when it comes to dealing with difficult people..:-) been there done that !
But this lecture of Margarat is absolutely useful not only for project managers .. but for every corporate worker. She explains how someone shoul deal with "difficult Mammals" very professionally.
As project managers we work with different types of people every day.. People with different attitudes, different levels of knowledge, different level of maturity, different nationalities etc.. So working with all the people is not same every day. We find some jerks some times.. But she explains how we shouldn't be another jerk in such situations.
Some times we think people are difficult.. but may be we are difficult too.. But if you want to know how you get away with all these corporate difficult situations as professionals without loosing the focus on our goals and work.. I recommend you to go through the lecture.
Specially in Sri Lanka we dont find such PM soft skills improvement lectures easily.. So this may be an alternative to improve your PM skills... Just check that out...
Saturday, October 18, 2008
Implimenting SCRUM in my new company
Changing the job was sort of a nerve breaking decision
But ….I did it again !..
not too bad .. for the 3rd time of my career:-)
With this decision I had to let go many things what I had.. Instead I got very interesting challenges and another new bunch of cool guys to work with....!..
Ok So I started at the new company.. I’m lucky enough it’s a startup so the start was not that hard. Lots of things to do at once… understanding the team members, skills, Projects, conflicts, risks, problems , issues…way forward , new processes (and more than anything getting used to some HR processes which I have never got used to J ) you name it !
I really appreciate the project centric culture which we are trying to build at the new company. But this needs little time to mature… No matter what.. Healthy corporate culture is very important for the people to be focused on their projects and not on other unnecessary facts and politics which I have”0” tolerance level...
Did you ask what I like the most about my new company?? Its my Note book bag.. :D Kind a cute…
Anyway that’s a different story..
What I thought to write here is that the experience of introducing SCRUM as the PM Framework to a totally new organization.
Its really a good experience. I started with one small team.. Who was quite corporative to adopt to a new way of doing things.. We created a very simple product backlog with all the user stories which need them to go through their research work. The PM (New SCRUM master )was very corporative and he found few cards which we could number as the Planning Poker card set. We started to play.. it was bit harder at first time.. But when it comes to 4th or 5th User story level the team was progressing so well. I was so thrilled to see all the silent team members talking in the planning poker session to back their idea about the user story weight.
Once we finished measuring the product backlog team created the Sprint back log. This project has only one sprint and that’s also 10 days.. Im happy that we started with a very small product backlog.
At the time of Sprint back log planning I could see some instant improvements from the team members. They worked so hard and actively as a team to get the sprint backlog planned. They decided to have the scrum meeting at 9 AM every morning..
Ok the very first Scrum day came … I was waiting… to observe their daily scrum meeting..few guys came .. they were having BF.. it was around 9.45AM still some guys are missing.. I thought.. I made a BIIG MISTAKE… Forget about scrum !! It doesn’t work…
I waited patiently till all the team members get together.. Had a very straight forward discussion.. To my surprise every team member accepted the importance of daily meeting at a specific time.. and they decided to have the everyday stand up meeting at 9.30 AM..
Ok lets see..
The next day the situation was so much better.. Almost all the team members were at office on time ready to have the meeting.. I got a skype message from the SCRUM master to come and observe the meeting.. It was a great start.. From that day onward the team progressed very well.. Understood the value of SCRUM, and value of their own team members.. Working on time boxes etc.. Currently they are about to complete the burn down of the sprint and seems they had a very good sprint.
Ok .. I think 10% of things I wanted to do was done with it.. the next task is to standardized the templates, artifacts and document the process and add them to the company process library..
The Next team situation was so much different. The Project was already initiated and that’s bit of a complicated case which I will study more and write in my next post…
Sunday, September 21, 2008
Planning Poker - the problem continues…
Now I have a new problem…. There you go… :
When Playing planning poker the team express ideas in front of the product owner to come in to a conclusion about the weight of user stories, clarifications, etc.
We do not have programmed robots in our teams to have same level of knowledge and skills. Though SCRUM is for good for good developers, ( Or even Software development is good for good developers according to Ken Schwaber - SCRUMforTEAMSYSTEM) in reality we get a mix to our teams..
So after observing the discussions going on …there is a product owner who says… Look I don't want guy X and Y in this team.. I need another like guy Z instead of X and Y . then we can burn down the back log more faster in sprints.. You guys agree to burn down only this amount in this sprint because your guys are not experienced. In traditional Project management what we do is we colour all our user front ending with really experienced and good guys and get the project delivered some way or the other. In SCRUM as we produce this much of transparency, Anybody who faced this issue and could you please explain how to overcome this issue..?
Saturday, September 20, 2008
101 post
Its hard to believe that I have earned some money from the blog.. And I received a gift card from Amazon :-).. So I can look forward to own some very good books..
Thanks to all you readers for reading my posts..Clicking the adds, Purchasing the Podcast.
More than anything Im so grateful for having patience with me for all my never delivered promises.. and specially reading not perfect language..
This blog helped me to network with most the known professionals around the world.. Im so happy about that. The knowledge we share is so valuable.
Thank you blog! Kiss kiss.. :-) Hug too... !! you are 100 posts rich.. ! ( some of them must be crap though ;-)
Friday, September 19, 2008
Problem I faced with Planning Poker
Labels: Estimation of Product Backlog, Product Owner, Scrum, Sprint

I copied this cartoon from www.implementingscrum.com.. Im a cartoon freek.. and thrilled to see SCRUM in cartoons...:-)
We played planning Poker for the 1st time and following are the problems I faced.. I will find the answers for these questions from experts and post them here later..
1. When Moderator reads 1 story we kept playing Poker and came out of an estimation to that specific story., But when we went through the PB more and more., team wanted to revise the previous story estimates again as its a comparative thing., How do you handle this situation?
Do you get the team to analyze the PB before coming to Planning poker so they will be more or less accurate with their comparative guess with other user stories in the rest of the product backlog?
2.There was one user story which we had to purchase some device for that. Scrum master ask where do we do the procurement management, planning , Cost estimation etc, Will SCRUM has some guidelines for procurement management for the project.
3. Customer who acted as the product owner didnt have answers for some of the questions.. there were situations such as I need to check with my infrastructure guys.. I need to ask my BI manager etc. How do you tackle that situation?
4. for certain stories we felt that we need the use cases or further analysis before thinking of their weight. ..
5. Looking at from the Project Office I saw many team for many projects they had different type of assessments. As an Example., same story "User needs to log in to the site and fill the registration form" was rated by the Team A as 5 and Team B as 20.. so how do I compare and see each team performance from the top when I look at my teams product burn down charts?
Comparison of SCRUM Vs PMBOK
* do not publish it (in print or on the web)
* do not circulate it (please direct people to this address)
Thursday, September 18, 2008
How to play Planning Poker
Ok this is how it is played..
1. Scrum master get ready with the Planning Poker card pack for each member of the team who participate this session
a. Those cards should have numbers such as 0,1/2 ,1,2,3,5,8,13,20,40,100. (Why these numbers ? Let me find out and tell you .. : )
b. Write the Numbers large so it is visible when needed.
2. Appoint a moderator (Can be anybody)
3. Ask the Product Owner to come to the Session ( He doesn't play Poker)
4. Moderate Read out the 1st User story
5. Team members question the Product Owner about the story and Product owner answer them
6. After all questions are answered, each estimator privately selects a card representing his or her estimate.
7. When everybody is ready all the members put selected card to the table.
8. There can be major variations., one member may have selected 2 while the other person has selected 5
9. Then they give reasons for selecting those numbers. One may think there is some additional research needed to perform the task., another may have thought much more easier way to do that task
10. Once all these points are discussed and asked the questions from the product owner, again the team play the Poker - This time its expected it to be more similar numbers
11. Of the numbers are not quite satisfactory it goes through another round. In normally you play the game for 2 rounds per story point. But there is no rule for that.
12. In last round if everybody comes with 3 and only one person comes with 5., we ask him or her whether she is agreeable to estimate the weight points as 3. If she agrees , we have no issue., if she doesn't agree we need to listen to the reasons.
i. Planning Poker brings Multiple experts opinion to the table
ii. It has the team buy in for the final decision
iii. Averaging Individual estimates lead to better results
iv. Its more fun than just traditional project estimation by Project Managers and few senior members of the team
- This idea is extracted from Mike Cohn's Agile estimation and planning.
Planning Poker for distant team members
I found this online Planning Poker game.. .. :-)
http://www.mountaingoatsoftware.com/page/26
WOW !! will it really work.. ? I think soo...
Problems when playing Planning Poker.
But It was really great. I think that does the purpose. I will try to find the answers for the following problems I faced and post them in the blog..
1. When Moderator reads 1 story we kept playing Poker and came out of an estimation to that specific story., But when we went through the PB more and more., team wanted to revise the previous story estimates again as its a comparative thing., How do you handle this situation?
Do you get the team to analyze the PB before coming to Planning poker so they will be more or less accurate with their comparative guess with other user stories in the rest of the product backlog?
2.There was one user story which we had to purchase some device for that. Scrum master ask where do we do the procurement management planning, Cost estimation etc, Will SCRUM has some guidelines for
procurement management for the project.
3. Customer who acted as the product owner didnt have answers for some of the questions.. there were situations such as I need to check with my infrastructure guys.. I need to ask my BI manager etc. How do you tackle that situation?
4. for certain stories we felt that we need the use cases or further analysis before thinking of their weight. ..
5. Looking at from the Project Office I saw many team for many projects they had different type of assessments. As an Example., same story "User needs to log in to the site and fill the registration
form" was rated by the Team A as 5 and Team B as 20.. so how do I compare and see each team performance from the top when I look at my teams product burn down charts?
Monday, September 15, 2008
PMBOK or RUP ?
Im sure you are one of them... Just like me.. Just lost in between SCRUM and PMBOK ways.Which way to go.. Both are good .. Both have its - points too. This is a great article which I found and I'm sure this will help most of you readers up to an extend..
"Many organizations wish to standardize their software engineering practices as well as their project management (PM) practices, and two well-known processes are available to help in both these areas, respectively. The IBM® Rational® Unified Process,® or RUP®, offers a prescriptive approach for standardizing on software engineering best practices, and the Project Management Institute® (PMI®) Guide to the Project Management Body of Knowledge® (PMBOK®) offers a descriptive approach for standardizing on project management best practices. With both these approaches available to organizations, the question becomes: Are they compatible? The simple answer is, "Yes."
http://www.ibm.com/developerworks/rational/library/4721.html
But have you seen RUP is practiced as RUP anywhere.. I haven't seen..Because RUP does not cover all the aspects of Project management as a whole. There are many specific agile PM methodologies which are elaborated from RUP which is practiced successfully in the industry.. SCRUM is almost every agile lovers favorite toy at the moment...
I will post a presentation about the comparison between both methodologies in near future.. ( Yeah I hear you I promise a lot and never deliver .. Bad Me!!! ) But this is something which Im working on right now..so I will keep up to my word :-)
Thursday, September 04, 2008
Explanation about Chrome
Im using it right at the moment.. Its beta....Cool..! I like it.. Bye byeee Mozila.. IE.. Had a good time with you :-) he he just kidding.. some times I need all of them..
BTW I love their presenation/explanation about Chrome.. Did you see that ?
Tuesday, September 02, 2008
The Program Management Office: Establishing, Managing And Growing the Value of a PMO
Tuesday, August 12, 2008
Gold Plating.. Dos or Don'ts
I can remember in some of the articles I have read said that Gold plating is something which you should avoid in projects. (This is one of the PMP Exam question too I suppose). .. Whats gold plating ??? No its not painting your accessories in gold color… Its about adding something to the deliveries which is out of the agreed project scope. May be some nice to have or fancy feature you are excited about. .. ..
Why is it so bad?? Coz that addition can create so much of burden and it creates most the project problems at the time of project acceptance.. Believe me I have experienced that. Once when we got to develop a developer guideline., we thought… ah ..Adding a starter kit is really fine to this Then the developers (The customer in this project ) can start the project much more easily..(We PMs love to impress customers : ). Though I knew its called gold plating.. I agreed to have that feature as a value addition.. as it didn’t show much impact to my timelines and budgets. (Smart Idea by my techlead J )..
But proving the theory at last, delivering that addition added more burden to us as it kept on giving some problems with the development environment. But the customer didn’t want to loose it either after seen the thing and highly taken up with the thing..So we had to put some more effort to solve the issues and provide a working starter kit with project deliveries.
But I noticed the following article at http://www.pcworld.com/businesscenter/article/148954-2/14_common_project_management_mistakes.html
“Fumi Kondo, managing director of NYC-based consultancy Intellilink Solutions, once observed an exchange between a software developer and a project manager where the developer told the project manager that he could add extra features to an application with no additional effort. The project manager told the developer not to add the extra features because users hadn't asked for them. "My response would have been,'Go to the users and see if those features are useful,'" says Kondo. "I see nothing wrong with over-delivering if it doesn't impact the budget or the schedule."
Don’t you think PM is right in this case.. He or she must have seen some risk of adding this additional work out of the scope.. One of my other PM friend explained an incident how a simple “Export to Excel” feature added to his reporting module ( which customer has not asked in the scope ., but they have given the feature as they thought its useful) made so much of trouble to him at the time of project acceptance..
In general Customers are pleased when you do your delivery right.. Adding those extra thingies here and there can really kill the success of your project records.. but you may never know those will have a long time pay back.. However I see the truth of avoiding such gold plating…
Monday, July 28, 2008
I wonder where they are...
I don’t know whether to write this post or not. Whether to publish this in the blog or not. But Its quite sad situation about the Project Management resource problem in SL IT industry...
Lately I started hunting a very good Project manager from the industry. We thought the best way is to recruit somebody through recommendations. So with lots of enthusiasm we sent the message across. Within few days I got about 5 CVs. 2 CVs looked promising and called them for an interview immediately.
First candidate: A guy who has been working as a project manager for company “X” for years. He has been working for the same project over a period and most of his experience was related to handling maintenance work. Never practiced or heard of any PM methodologies but seems he is handling the current scope of work with no much issue. Never got exposed to Development projects and all the projects have been customization projects of 3rd party product. When I threw few tricky questions about estimates…… I lost all my moral as he didn’t have a clue of project estimates. Always the estimates were done by somebody else and passed to him. Or estimates were never done. He didn’t even know how to defend himself from an unrealistic estimate. Overseas Projects – Never done..OK fine.. “over 7 years of Experience as a Project Manager” The expected salary hit the sealing…
Results –“OUT” -Who cares… Many more to interview and see..
Another– A Guy who has handled projects over 3 years.. Seems very enthusiastic.. Communication - Lot more to improve in order to do a project management role..He has been handling some outdated projects and he has got fed up of his work.. I asked a question..
Me : “How do you time estimate a project when you don’t know the technical side of the development work.. “
Interviewee : (was in deep thinking process… after few min…).” I ask the developers”
Me : Ok fine.. But they will think.. this guy don’t know anything about our work.. we will give him some false estimates and see.. Then what do you do? Do you just pass me the same estimate that you get from them?
Interviewee: NO I always take 80% of an estimate what developers give me.
Me : :-D (thinking….Hern protects the developers)
Results : Out !!!
Ok.. Cant wait anymore.. Called a reputed recruitment Agency.. Got 5 CVs.. All of them with MBAs, many years experience ….Works!! Very promising.. I called all..
1st one.. Nerd.. No PM experience.. He has handled a team of 5 developers over 6 years.. He is not PM material Period!! He was talking about why SL IT is not moving towards Open source.. I was counting each min I spent.. still I couldn’t end the discussion. Then I told him.. Look., Your profile doesn’t match with the current opportunity I have ., when I have another I will call you.. Then he was telling me that he has a project in hand which he can give to the company if we recruit him.. It was hard for me to send him out…..Finally I said.. I have another meeting…
Next . Currently working as an IT manager.. No experience as a PM.. I don’t know how it was there in the CV. He has got exposed to the AS400 Development and gone overseas as an IT manager.. Not updated with technology or managing projects. He himself accepted the situation.
Next was a guy who is a developer.. Working as a team leader.. Like to move in to Project Management career .. It didn’t take much time for me to realize why he needs to move in to PM from development.. Oh boy he thought the PMs are paid well.. J When I first asked he said his passion is Project Management ., next time when I said we have 2 opportunities 1 is for PM and another is a Senior SE and we pay the same salary for both positions.. He asked me “In that case can I apply as a SSE in this company ..? “ Shew ….
Ok another.. Worked in a Gov Dept. Who handle some projects.. But not fit in to the Private sector Project management.. He told me that he thought the vacancy was for a BA. THANK YOU..
The Next .. Good guy.. Looks good .. Good PR.. good communication ..here we go
Me: Have you experienced any project failures
Interviewee: No I never fail I don’t like to fail
Me: Very good. So let me ask you this question.. Have you had any tight budgets for any projects?
Interviewee: Yes Once I had only 1 Million Budget and my detailed estimate gave me a project cost of 1.5 Million
Me: Interesting.. So what did you do?
Interviewee: Its not a problem to me.. I don’t plan any 8 hour schedules. I always plan 10 – 12 hour schedules. Then we can finish additional work with no cost. I think a developer can work till 11 PM with no issue.. Its an acceptable time for a software developer to work. Always my teams do that with no questions. Therefore I managed to finish the projects within the budgets allocated to me.
Grow up baby !!!
Whats next?.. Calling another recruitment agency…
PS: I thought of adding this line after receiving some comments about this post. This post doesnt mean to say there are no good Project Managers in Sri Lanka. When you look at Software industry, Some of the world's largest project such as huge stock exchange projects, Telco projects are outsourced to Sri Lanka and there are really good PMs managing those projects. What I see is currently there is a big vacuum in the market and this is only the interview experience